The MCL type is a plum-shaped elastic coupling with a braking wheel (the core is an integr...
Don't hesitate to send a message
The characteristics of the non-metallic elastic element flexible coupling are as follows - Strong buffering and vibration absorption: Utilizing non-metallic materials such as rubber and nylon, it has excellent vibration reduction and noise reduction effects, and can withstand large load impacts.
- Simple structure: Low cost, easy installation and maintenance, and easy replacement of elastic components.
- Prone to aging: Non-metallic materials are not resistant to high temperatures and are prone to aging, and their service life is greatly affected by the environment.
- Has backlash: Elastic deformation will cause a slight transmission lag (backlash), which is not suitable for ultra-precision transmission. Our company offers a wide range of products, including jaw couplings, tire couplings, elastic pin couplings, and bush-pin couplings, etc.
The MCL type is a plum-shaped elastic coupling with a braking wheel (the core is an integr...
Structure performance:1. Compact size,small inertia.2. The coupling is made of engineering...
Zhongye Heavy Industry Technology (Zhenjiang) Co., Ltd. is located in a well-known ancient city, Zhenjiang. We are an enterprise integrating R & D, manufacturing, and sales. Our products are widely used in metallurgical equipment, mining equipment, water equipment, lifting equipment, paper equipment, port equipment and other industries.
Our main products are toothed coupling, elastic sleeve column pin coupling, elastic column pin coupling, gear coupling with elastic pin, a universal coupling, tire coupling, jaw coupling, star coupling, diaphragm coupling, drum coupling and grid coupling, the Oldham coupling, flange coupling, clip shell coupling, GL type roller chain coupling and a safety coupling, and so on. Our company also undertakes a variety of non - standard coupling designs and manufacturing.
New workshop covers an area of about 16463.52 m². heavy workshop 5,500 M2, Precision workshop 4,600 m² , office building and the gymnasium 2000 M2, Dinning hall 500m² , Warehouse 1000 m², Roads, greening, parking areas 3563 M2.
